District Mills Blog

01
Oct, 12

Bestia Restaurant Installation

Lots of overtime, lots of hard work, but the day has come to take our babies out of the shop and get them out into the world to their final home.

seating frame

Frame leaving the loading dock on Garey St.

Hit the link below for more photos from the install.

bench

Bench with upholstery

steel fram

Final welded steel frame. Lightweight is not an applicable description.

Frame arriving in front of the new restaurant location

Forklifting and manpowering into the doorway. Took about 9 of us to maneuver it in

Tye and Joe unloading tabletops. They’ve been kicking ass on these and rumor is these have the tightest seams they’ve ever made.

red table legs

Table legs after they’ve been turned and painted. We’re into the red accents happening in the restaurant (check out their oven when you go)

leveling out and beginning install of the seating and tables.

Make Sure to check back in a few weeks to see pictures of the final install, or better yet, go sit comfortably and fill your belly at Bestia!

No comments yet.

Leave a Reply